Welcome to the website of Huai'an Hanji New Material Co., Ltd!

水泥毯价格

Product classification

Keywords

Contact

Company name: Huai'an Hanji New Material Co., Ltd.

Contact: Mr. Han

Phone: 13365166988

Mobile: 13365166988

Email: hansanhua@126.com

Address: No. 36 Jingshi Road, Huai'an District, Huai'an City, Jiangsu Province

Website: www.hjsnt.cn

Website: en.hjsnt.cn

Cement blanket prices are negotiable


太仓Cement blanket agent

Your current location: Home page >> Products >> 太仓水泥毯

太仓Cement blanket agent

  • Taxonomy:太仓水泥毯

  • Click times:
  • Date of release:2020/05/26
  • Online inquiry
Detailed introduction

Cement blanket agent

Construction of Hanji cement blanket


1 Preparation

First, plan and measure to ensure a certain slope, so that the water can flow smoothly from the upper end to the lower end; second, after the construction site is cleaned and leveled, the construction line is set according to the design drawing, and the drainage slope is remeasured.


2 excavation

Set up the construction line according to the design requirements, the two sides of the ditch need to be leveled, and the slope inside the ditch must be free of empty soil and voids. The water damage parts shall be tamped, except for the debris and gravel in the slope. If necessary, use Sanqi lime soil for tamping, or grouting for reinforcement and then close it. It is required that the treated parts are stable!


3 laying

The cement blanket material can be laid vertically and horizontally. Please be sure to flatten the substrate, otherwise it will affect the appearance quality!


4 Seam treatment

①Dig a pit with a width of 10 cm and a depth that is twice the depth of the cement blanket at the overlapping position of the two adjacent cement blankets. Put the new cement blanket joint at the overlapping position and flatten it.

②Press the upper cement blanket on the lower cement blanket in the direction of the water flow, and the overlap should not be less than 10cm.

③Evenly apply sealant on the joints.

④Fix two cement blankets with Φ 5 * 38mm stainless steel screws.


5 Groove treatment

Use rivets to fix the edge of the material on the edge of the ditch, and also use rivets to fix the overlap. After fixing, cover the edge with soil.


6 Water curing

Before the watering, the entire paving needs to be inspected and accepted, and only after passing the water! It needs to be watered 9kg per square (thickness is calculated by 10mm). It is necessary to pour through. It is necessary to sprinkle water evenly from the edge to the middle. It is best to use spraying method. The flow rate is 4000ml / min until the cement blanket becomes darker. Do not use water column with high pressure! It is forbidden to step on after watering. When the temperature is ≤5 ℃, heat preservation measures should be taken; when the average day and night temperature is higher than 30 ℃, the surface should be covered with plastic film or geotextile to keep it moist.


The address of this article:http://en.hjsnt.cn/product/557.html

Key word:Huaiancementblanketmanufacturer,Huaiancementblanketprice,Cementblanketmanufacturerswholesale

The last one:None
The next one:太仓New cement blanket price manufacturers

Recently browse: