Welcome to the website of Huai'an Hanji New Material Co., Ltd!

水泥毯价格

Product classification

Keywords

Contact

Company name: Huai'an Hanji New Material Co., Ltd.

Contact: Mr. Han

Phone: 13365166988

Mobile: 13365166988

Email: hansanhua@126.com

Address: No. 36 Jingshi Road, Huai'an District, Huai'an City, Jiangsu Province

Website: www.hjsnt.cn

Website: en.hjsnt.cn

Cement blanket prices are negotiable


New cement blanket project

Your current location: Home page >> Products >> 水泥毯

New cement blanket project

  • Taxonomy:水泥毯

  • Click times:
  • Date of release:2020/05/26
  • Online inquiry
Detailed introduction

Huai'an cement blanket price

Hanji cement blanket inspection project


2.1 Before laying the composite cement blanket, the base must be fully tamped. The simple measurement method is: use Φ 12mm steel brazing, use 30kg pressure, insert the soil body less than 5cm.


Number of inspections: random inspection


Inspection method: observe and measure with tools.




2.2. The bottom of the ditch and the side of the ditch are required to be flat; the deviation of the ditch cross section size is not easy to exceed 5cm. The base is leveled. After laying the composite material blanket, the flatness is measured with a 3m string, and the average loss is not more than 20mm.


Number of inspections: random inspection


Inspection method: observe and measure with steel ruler.




2.3. The error of anchor spacing is required to be ± 5cm; the construction error of screw spacing is ± 2cm. There should be no missing or missing nails, and the nails should be firmly fixed.


Number of inspections: all inspections


Inspection method: observe and measure with steel ruler.




2.4 Watering should be even and watered until the blanket becomes darker. Each square meter is not less than 9kg (calculated by 10mm thick blanket), and watering is not necessary. More watering does not affect the quality of the project.




2.5. The brush slurry must be uniform and the thickness must be uniform. The cement: water mass ratio is 1: 3 ~ 1: 4.


Number of inspections: random inspection


Inspection method: observation.




2.6. The PVC drain pipe of the drainage hole shall be arranged in a plum shape of 2m × 2m, shall not be omitted, and shall be installed firmly.


Number of inspections: all inspections


Inspection method: observe and measure with steel ruler.




2.7. The reserved size of the end surface shall comply with the regulations: the top surface of the side slope shall have a width of 1-2m, and the bottom surface shall have a length of 50cm.


Number of inspections: all inspections


Inspection method: observe and measure with steel ruler.




2.8. The cement blanket manufacturer tells you that the material laying and installation should meet the requirements of the construction design, and that it is stable and firm, tightly sealed, smooth and beautiful.


Number of inspections: all inspections


Inspection method: observe and measure with steel ruler.






Later maintenance and precautions


1. This material is used in the central region of China, with a design life of more than 50 years. In order to extend the life, it is recommended to maintain the material every 5-10 years. Brushing a layer of cement slurry on the surface of the material blanket can effectively extend the life of the material.


2. After the strength of the material reaches 10.0MPa, it can bear the load of personnel and light construction machinery.


3. After the material is poured into water, it must not be knocked or pulled until the final strength is formed; sharp objects must not be used to knock on the material.


The address of this article:http://en.hjsnt.cn/product/560.html

Key word:Huaiancementblanketprice,Cementblanketmanufacturers,Cementblanketwholesale

Recently browse: